Continuous Casting No. 3, Electrical Ladle Furnace No. 3
| Client | Nová Huť, a.s. |
| Country | Czech Republic |
| Range | MCC, I&C - basic design |
| Wherewithal | Siemens |
| Ended | 01-03-1997 |
BOF, Alloy Batching, Oxygen Lance
| Client | Třinecké železárny, a.s. |
| Country | Czech Republic |
| Range | MCC, I&C |
| Wherewithal | ABB Advant |
| Ended | 01-02-1997 |
160t Fluid Bed Boiler K12N
| Client | Energetika Třinec, a.s. |
| Country | Czech Republic |
| Range | MCC, I&C, Protection System |
| Wherewithal | ABB Master, Simatic S5-F |
| Ended | 01-12-1996 |
Wire/Rod Mill, 1. Phase
| Client | Nová Huť, a.s. |
| Country | Czech Republic |
| Range | MCC, I&C |
| Wherewithal | ABB Master, Drives ABB |
| Ended | 01-11-1996 |
Waste-Heat Boiler Behind Reheating Furnace
| Client | Třinecké železárny, a.s |
| Country | Czech Republic |
| Range | MCC, I&C |
| Wherewithal | ABB Master |
| Ended | 01-11-1996 |
Water Feeding Station for the Boilers (E3)
| Client | Energetika Třinec, a.s. |
| Country | Czech Republic |
| Range | MCC, I&C |
| Wherewithal | Simatic S5 |
| Ended | 01-11-1996 |
Industrial Waste Water Treatment Plant, Alcan
| Client | Alcan |
| Country | Germany |
| Range | Control System - programming |
| Wherewithal | ABB Advant |
| Ended | 01-09-1996 |
Continuous Measurement O2 and CO, Boilers
| Client | Teplárna Karviná, a. s. |
| Country | Czech Republic |
| Range | Instrumentation - design |
| Wherewithal | |
| Ended | 01-08-1996 |
Desulphurisation Plant – (FGD), Power Plant Dětmarovice
| Client | ČEZ, a. s. |
| Country | Czech Republic |
| Range | I&C - basic design |
| Wherewithal | |
| Ended | 01-08-1996 |
Paper Machine PM7, Coating Machine
| Client | SCP Ružomberok |
| Country | Slovakia |
| Range | I&C - programming |
| Wherewithal | ABB Advant |
| Ended | 01-08-1996 |